WORK DONE
DREDGING BY DREDGER SHIP AT BA TRI FISHING PORT
Dredging construction by dredger ship:
- Scope of works: Dredging.
- Quantity: 300.000 m3 (provisional).
- Location: Ba Tri - Bến Tre province.
CONSTRUCTION FOUNDATION & DRIVING SPUN PILE PHC D1000 FOR WIND TURBINE GENERATOR - TRÀ VINH PROVINCE
- Construction driving spun pile PHC D1000
- Scope of works: Construction foundation and driving spun pile for Wind Turbine Generator.
- Location: Duyên Hải - Trà Vinh Province - VietNam.
CONSTRUCTION OFFSHORE WIND TURBINE GENERATOR 350MW, CÀ MAU PROVINCE
- Construction Offshore Wind Turbine Generator 350MW at Cà Mau
- Location: Đầm dơi, Cà Mau province, Việt Nam
INLAND PORT HỒNG LONG - Phase 1
- Provide materials and construction embankment, inland port Hồng Long - Phase 1
- Location: Phú Mỹ - BR Vũng Tàu
INLAND PORT HỒNG LONG - Phase 2
- Construction embankment behind port.
- Provide materials and construction for inland Hồng Long port - Phase 2