Our manpower has many years’ experiences in this construction for Port, waterway field and the suitable within much equipment so TRAN MINH ANH CONSTRUCTION AND LOGISTICS CO., LTD specially to construct Port, Harbor projects – embankment protection for river/ sea, infrastructure as below:
- Construction of the river Port, Sea Harbor.
- Construction of embankment protection at riverside, coast.
- Construction of dam prevent sand bedding backfill; quay to prevent waves.
- Construction of outlet discharge gate on river.
- Backfill ground level, protection for coast and islands.
Procedures to construct Port/ Harbor project as below:
· The Client approval the design drawings, Authorities approval and issued Construction Permit.
· Provide concrete post-tendon for Spun pile, sheet pile, steel pile to site.
· Driving concrete post-tendon for Spun pile, sheet pile, steel pile to site.
· Installation steel platform to do structural items above.
· Construction reinforcement concrete for pile caps (cast-in-situ, pre-casted and installation)
· Construction reinforcement concrete for beams (cast-in-situ, pre-casted and installation)
· Construction reinforcement concrete for slabs (cast-in-situ, pre-casted and installation)
· Installation of the fender/ rubber cushion and pollard for port, installation power systems, lightings, water supply systems.
· Installation of crane (if have)
· Finishing works

The jetty 5000(T) at Kampot International Port, Kampot province, Kingdom of Cambodia

The transshipment port for iron ore at Kampot Logistics Port, Kampot province, Kingdom of Cambodia